Sunday, May 1, 2011
GSK Dungarvan - 8 New Refrigeration Units
Project Arctic, involving the de-installation of existing refrigeration units from the roofs of two production buildings in Dungarvan, Waterford and the installation of 8 new refrigeration units, all structural steelwork, pumps, pipework and valves. This project was completed on time and on budget.
Wednesday, December 1, 2010
Merck Sharp & Dohme UK
Radley Engineering completed on schedule a number of clean systems which included clean steam and process lines for March Sharp & Dome as part of the NSBB upgrade project. This project was completed over a 3 month period on site back up by our high purity fabrication facilities at our workshop.
Friday, October 1, 2010
Pfizer Ireland
Radley Engineering has completed the Kilo Lab. Upgrade modules for Pfizer Ireland Pharmaceutics in Ringaskiddy Cork. These modules were manufactured to the highest standard which included orbital welding of both 316L and Alloy materials.
Wednesday, September 1, 2010
GlaxoSmithKline UK
Radley Engineering completed on schedule new purified water loop on site for GlaxoSmithkline UK. This project was completed over a 3 month period on site which involved the installation of a loop which serviced new laboratories/clean rooms in an existing building.
Sunday, August 1, 2010
Schering Plough P6
Radley Engineering as the main mechanical contractor has completed on schedule the new P6 Hydrogenation project for Schering Plough Rathdrum. This facility was completed over a 5 month period on site which involved the installation of 7000 meters of pipe and the fabrication and installation of 9 PAVs (Pre-assembled Volumes).
This project also involved the installation of hydrogenator, hastelloy reactors, chillers and pumps. This project involved the fabrication and installation of a number of PAVs were installed on site as a complete pipe rack. From a safety point of view this numbered the hours working at height on site considerably. This Pie rack fabrication can be viewed on our (Add Link) It is on photo gallery in the skids
This project also involved the installation of hydrogenator, hastelloy reactors, chillers and pumps. This project involved the fabrication and installation of a number of PAVs were installed on site as a complete pipe rack. From a safety point of view this numbered the hours working at height on site considerably. This Pie rack fabrication can be viewed on our (Add Link) It is on photo gallery in the skids
Tuesday, June 1, 2010
Genzyme FFCE
Radley Engineering as the main mechanical contractor has completed on schedule the new Fill Finish Capacity Expansion project for Genzyme Ireland. This facility was completed over an 8 month period on site which involved the installation of 8,000 meters of pipe.
This project involved the installation of three lyophilysers and associated vial washing, filling and capping lines. Radley's also installed clean steam and PUW generators and all associated clean system pipe work. In addition to all of the clean systems above we also installed the air handling equipment and the HVAC systems.
This project involved the installation of three lyophilysers and associated vial washing, filling and capping lines. Radley's also installed clean steam and PUW generators and all associated clean system pipe work. In addition to all of the clean systems above we also installed the air handling equipment and the HVAC systems.