Schering Plough P6

Radley Engineering as the main mechanical contractor has completed on schedule the new P6 Hydrogenation project for Schering Plough Rathdrum. This facility was completed over a 5 month period on site which involved the installation of 7000 meters of pipe and the fabrication and installation of 9 PAVs (Pre-assembled Volumes).
This project also involved the installation of hydrogenator, hastelloy reactors, chillers and pumps. This project involved the fabrication and installation of a number of PAVs were installed on site as a complete pipe rack. From a safety point of view this numbered the hours working at height on site considerably. This Pie rack fabrication can be viewed on our (Add Link) It is on photo gallery in the skids
A European leader in the manufacture of high quality stainless steel and carbon steel fabrications.
Website By: Deise Design